LTP15 will run from 2024-03-11T00:00:00 to 2024-07-01T00:00:00

Orbital context

Plots are in GSE (geocentric solar ecliptic) coordinates, so Earth is at [0,0], the Sun is at [1,0]. The plot is the projection of the orbit on the ecliptic plane. 


Animated Version: Orbit_GSE_2024H1.mp4

Definition for the grey shading representing downlink rates:

  • white = maximum downlink rate at which you can empty the SSMM in ~10 days
  • light-grey = SSMM fill state decreases with everyone operating at EID-A rates
  • mid-grey = SSMM fill state increases within RSW (10 instruments operating) and decreases outside RSW (IS-only breakeven rate < downlink rate < inside-RSW breakeven rate )
  • dark-grey = SSMM fill state increases with just IS operating (downlink rate < IS-only breakeven rate)

RS window placement

SWT-36 (April 2023) decided on the following RS windows to be placed in LTP-15 at the following times and locations:

Window

EXT Start

Start

End

Heliocentric
Distance
Range [au]

Heliographic
Latitude
Range [deg]

SC-Sun-Earth
Angle Range
[deg]

Conjunction

Safe Mode Comms Blackout

Largest
Comms
Roll

GAM Restrictions

RSW13
(12 d)
2024-03-112024-03-13T00:00:002024-03-25T00:00:000.53
0.37-6.27-8.0
(24-03-24)
-7.9914.07

0.6

(24-03-20)

14.8
/
/
RSW14
(14 d)

2024-03-27T00:00:002024-04-10T00:00:000.34

0.29
(24-04-04)

0.32-7.79
2.8823.3
107.7
/
/
RSW15
(4 d)

2024-04-12T00:00:002024-04-16T00:00:000.34
0.384.37
6.37117.7
133.5
/
/


GAMs and conjunctions

  • Inferior conjunction on 2024-03-20 does not have effect on data downlink or operations
  • No GAM in this period.

Science and calibration planning

Note the text in red highlights adjustments still to be made in SOOP Kitchen plan during Long Term Planning

Coordinated science (and cross-calibration) campaigns:

As agreed at SWT #36 (April 2023), to be worked out in further detail during SOWG in Jan 2024:

RSW 13 Sun-Earth line crossing (2024-03-13 to 2024-03-25) 

  • 2024-03-13: R_SMALL_HRES_MCAD_Full-Disk-Mosaic - 25 pointings to cover full solar disk (5 hours)
    SOOP Coordinator: D. Berghmans 

  • 2023-03-13 to 16: L_FULL_HRES_HCAD_Eruption-Watch Metis-led, Disk Centre pointing 
    SOOP Coordinator: C. Sasso
  • 2024-03-20: Metis calibration at sun centre (~ 3hrs)
  • 2024-03-20 to 22: SPICE-led L_SMALL_MRES_MCAD_Composition-Mosaic to find connection point with S/C, at Sun-Earth line crossing. New style mosaic consisting of 12 pointings, ~4hrs dwell each- pVSTP
    In parallel: instrument-specific cross-calibrations with Earth-bound observatories during Sun-Earth line crossing at 0.43 au (2023-03-20)
    SOOP Coordinators: A. To 
  • 2023-03-22 (TBC): R_SMALL_MRES_HCAD_Sunspot-Oscillations (8 hrs) pVSTP
    SOOP Coordinator: A. Fludra
  • 2023-03-23 to 24: L_BOTH_HRES_HCAD_Major-Flare flare hunting campaign pVSTP
    SOOP Coordinator: D. Ryan

RSW 14 Perihelion and quadrature with Earth (2024-03-27 to 2024-04-10)

  • 2024-03-27 to 28 (TBC): disk centre pointed observations leading up to the PSP-SO quadrature
  • 2024-03-29 to 30: PSP-SO quadrature observations including

RSW 15 (2024-04-12 to 2024-04-16)

IS calibrations:

RS calibrations: 

  • 2024-05-01: Star calibration Metis + EUI/SPICE (requiring limb pointing) for Alpha Virginis

IS-only science:

SOOP Kitchen plan

High-level (=MLP) plan: https://solarorbiter.esac.esa.int/soopkitchen/#/planning/plan/Mission%20Level%20Plan%20for%20NMP%20Segment%203 

Starting point for LTP planning in SOWG: to be added after LTP-15 event files have been received from MOC (expected end Dec 2023)

Final plan LTP15: to be added after SOWG review and final consolidation of plan (expected end Jan 2024)

Reference material